
Ground Screw Foundations
Engineered helical pile foundations sized to your structural loads. Replaces strip and pad foundations on most low to mid-rise builds.
- Load tested designs
- Soil-matched pile schedule
- Building Control ready

A level ground screw base for entertainment decking overlooking the South Downs, completed in a single day.
A level ground screw base for entertainment decking overlooking the South Downs, completed in a single day. Our team surveyed the ground, engineered a pile schedule to the structural loads and delivered the installation with on-site load testing and a signed compression report on completion.



Create a stable, level foundation for new entertainment decking to overlook the gardens and South Downs views without damaging the surrounding lawn.
The proposed footprint sat across a pronounced garden slope. Varying ground levels and a sensitive, landscaped setting made a conventional concrete base disruptive and difficult to construct.
The pile positions were carefully set out before galvanised ground screws were installed to suit the changing levels. Adjustable heads created a consistent datum for the timber structure while keeping excavation and spoil to a minimum.
The completed screw layout provides a clean, level and frame ready base across the sloping garden. The surrounding landscape remained largely undisturbed and the project was completed in one day.






Engineered helical pile foundations sized to your structural loads. Replaces strip and pad foundations on most low to mid-rise builds.

Certified rig teams install piles to depth in hours, not days. Compact rigs for tight access, no spoil, no concrete, ready to build same day.

Independent in-house load testing on every install. Compression test reports issued per project to satisfy structural and Building Control sign-off.
Get a Quote
Free, no obligation quote within 24 hours. Upload plans or just describe what you are building and we will handle the rest.